Skip to content
Illustration of a motorway on an embankment between flat polders and channels with an amber route line

Netherlands

Transport to the Netherlands

Request a quote

We deliver to and from the Netherlands: from anywhere to anywhere across Europe, in full trailers or by the pallet. The Netherlands is one of Europe's key logistics hubs thanks to the port of Rotterdam; we serve the whole country, including the port areas.

Coverage
All of the Netherlands
Express
Delivery within 24 hours
from pickup

Reply the same working day

Request a quote

Step 1 of 3

  1. Route
  2. Vehicle and details
  3. Contact

From anywhere: type a city or postcode

Anywhere: start typing and we'll suggest cities

Pick a day in the calendar or leave As soon as possible

We send you an individual price, the same working day.

What to watch out for in the Netherlands

Rules for trucks in the Netherlands. Each rule includes the source and date of verification.

  • The Netherlands has charged a per-kilometre toll for trucks over 3.5 t since 1 July 2026

    over 3.5 t

    Categories N2 and N3 by technical maximum weight; foreign vehicles too

    • Charged for every kilometre driven on almost all motorways and some provincial and municipal roads
    • Each vehicle needs a contract with a provider and a functioning on-board unit (tolkastje) even when it drives only on roads where no toll applies
    • Some vehicles are exempt, for example electric vehicles up to 4,250 kg an exempt vehicle with foreign plates must be reported
    • The Eurovignette for the Netherlands has ended checks have been running since 1 July
  • Zero-emission zones are being introduced in 28 Dutch cities and at Schiphol

    • No entry for trucks registered before 2017
    • Zero emissions only for trucks registered from 1 January 2025
    • Euro VI solo vehicles (registered 2017–2019) can enter until 1 January 2028
    • Euro VI solo vehicles (2020–2024) and tractor units (2017–2024) can enter until 1 January 2030
  • Dangerous goods (ADR): Dutch road tunnels have categories A to E

    • a
    • c
    • d
    • e

    Categories A to E, there is no category B; sign C 22 with an additional plate showing the category letter

    • The categories apply from 1 January 2010
    • Category C, among others Coentunnel, Beneluxtunnel
    • Category D, among others Botlektunnel, IJtunnel, Maastunnel, Piet Heintunnel
    • Category E ArenAtunnel, Stadsbaantunnel, one tube of Gaasperdammertunnel
    • The prohibited substances are given by column 15 of the ADR substance list; bans of a lower category also apply in higher ones
    • Transport of certain substances is additionally tied to designated routes (routeplicht)
  • A truck may not weigh more than 50 t in the Netherlands; longer combination vehicles (LZV) have special rules

    up to 50 t

    Including load; a simplified general limit from the government website

    • A foreign vehicle may not exceed its technically permissible weight either
    • Tractor-trailer combination at most 16.50 m
    • Vehicle with trailer at most 18.75 m
    • Height with load at most 4.00 m
    • LZV with an annual RDW permit on designated roads up to 25.25 m (without a hydraulic tail lift) and 60 t

Distances to cities in the Netherlands

The shortest distance is from Rotterdam to Amsterdam (79 km), the longest from Warsaw to Rotterdam (1,234 km). All 17 connections are under 1,250 km.

From

Road distance

Driving time

Single-driver journey

1,250 km

  1. Munich

    835 km

    about 11.1 h

    2 days

  2. Prague

    911 km

    about 12.1 h

    2 days

  3. Milan

    1,040 km

    about 13.9 h

    2 days

  4. Vienna

    1,158 km

    about 15.4 h

    2 days

  5. Warsaw

    1,234 km

    about 16.5 h

    2 days

How we calculate

Road distance: OpenStreetMap, OSRM routing (car profile), approximate. Driving time: truck average 75 km/h (our assumption). Single-driver journey: maximum 9 hours driving per day, twice weekly up to 10 hours (Regulation (EC) No 561/2006, Art. 6, and AETR Agreement, Art. 6). With two drivers, the journey is shorter. Loading and delivery times are always confirmed in the offer.

All 17 distances
MunichPragueMilanViennaWarsawRotterdam
Rotterdam835 km 2 days911 km 2 days1,040 km 2 days1,158 km 2 days1,234 km 2 days–
Eindhoven733 km 2 days826 km 2 days960 km 2 days1,056 km 2 days1,185 km 2 days110 km 1 day
Amsterdam827 km 2 days880 km 2 days1,080 km 2 days1,149 km 2 days1,197 km 2 days79 km 1 day

Source: OpenStreetMap (OSRM), Regulation (EC) No 561/2006, AETR · checked 15 October 2026

Where loading takes place in the Netherlands

Four locations for loading and transshipment of goods. One verified fact for each.

  • Port of Rotterdam

    428.4 million t

    cargo handled in 2025

  • Port of Amsterdam

    62.1 million t

    cargo handled in 2025 (volume almost stable)

  • Greenport Venlo Rail Terminal

    up to 800,000 TEU

    annual capacity of the rail terminal

  • Port of Moerdijk

    The Port of Moerdijk has 5.7 km of quay, 35 km of railway and 40 km of road, and connects sea, inland water, road, rail and pipeline.

Where we load and unload

Netherlands

Main hubs

Available Services

  • FTL Transport

    Full truckload shipments across Europe. Direct delivery without transshipment on an agreed schedule.

    Learn more
  • LTL Transport

    Groupage transport for partial shipments. An economical solution for smaller volumes.

    Learn more
  • ADR Transport

    Transport of dangerous goods in compliance with ADR regulations. Specialized vehicles and complete documentation.

    Learn more
  • Express Delivery

    Urgent shipments delivered within 24 hours. Dispatch Mon-Fri 08:00-17:00 and priority handling.

    Learn more
  • Coil Transport

    Transport of steel coils using specialized Coil Mulde trailers. Safe securing and handling of heavy cargo.

    Learn more

Partnership for Hauliers

For carriers

Fuel cards, toll units, fast payments and tractor unit rental. We agree the terms in advance.

Experienced drivers for international lanes are welcome.

Frequently Asked Questions

Didn't find your answer? info@everestsolutions.cz

Yes. We deliver to and from the Netherlands, from anywhere to anywhere across Europe, in full trailers or by the pallet. We send the quote the same working day.

Sources and verification

All data on the page were verified on 15 October 2026.

  1. 1
  2. 2

    RVO / ministry IenW, Zero-emissiezones in veel steden (ondernemersplein.overheid.nl); OpwegnaarZES

    ondernemersplein.overheid.nlopwegnaarzes.nlopwegnaarzes.nlondernemersplein.overheid.nlrdw.nl

  3. 3

    Regeling vervoer over land van gevaarlijke stoffen, Art. 3 (wetten.overheid.nl); ILT

    wetten.overheid.nlilent.nl

  4. 4

    Rijksoverheid, Veilig rijden in de vrachtwagen; RDW (LZV)

    rijksoverheid.nlrdw.nlwetten.overheid.nl

  5. 5

    Havenbedrijf Rotterdam, press release of 26 February 2026 (portofrotterdam.com)

    portofrotterdam.com

  6. 6

    Port of Amsterdam, Annual Report 2025 (portofamsterdam.com)

    portofamsterdam.com

  7. 7

    Ontwikkelbedrijf Greenport Venlo, Rail Terminals (greenportvenlo.nl)

    greenportvenlo.nl

  8. 8

    Havenbedrijf Moerdijk, Feiten en cijfers (portofmoerdijk.nl)

    portofmoerdijk.nl

  9. 9

    OpenStreetMap (OSRM), Regulation (EC) No 561/2006 and AETR agreement

    openstreetmap.orgeur-lex.europa.eu

  10. 10

    Everest's own website and terms and conditions

    ev-sol.cz