FTL Transport
Full truckload shipments across Europe. Direct delivery without transshipment on an agreed schedule.
Learn more
Antwerp Belgium
We deliver to and from Antwerp: from anywhere to anywhere across Europe, in full trailers or by the pallet. Antwerp is Europe's second-largest port and a hub for the chemical industry.
Reply the same working day
Step 1 of 3
From anywhere: type a city or postcode
Anywhere: start typing and we'll suggest cities
Pick a day in the calendar or leave As soon as possible
We send you an individual price, the same working day.
From Rotterdam, one driver can reach Antwerp in one day, from Munich, Prague, Milan, Vienna and Warsaw in two days. From Warsaw it is more than 1,250 km: we will agree the delivery time in the offer.
From
Road distance
Pure driving
One driver's journey
1,250 km
Rotterdam
102 km
about 1.4 h
1 day
Munich
787 km
about 10.5 h
2 days
Prague
904 km
about 12.1 h
2 days
Milan
944 km
about 12.6 h
2 days
Vienna
1,110 km
about 14.8 h
2 days
Warsaw
1,265 km
about 16.9 h
2 days
Road distance: OpenStreetMap, OSRM routing (car profile), approximate. Pure driving: truck averages 75 km/h (our assumption). One driver's journey: maximum 9 hours driving per day, twice weekly 10 hours (Regulation (EC) No 561/2006, Art. 6, and AETR Agreement, Art. 6). With two drivers, the journey is shorter. Loading and delivery times are always confirmed in the offer.
Source: OpenStreetMap (OSRM), Regulation (EC) No 561/2006, AETR · checked 15 October 2026
Rules that apply to trucks in Belgium and in Antwerp. Each rule includes the source and the verification date.
over 3.5 t
Categories N and semi-trailer tractors N1 (body code BC); Belgian and foreign vehicles
The toll applies to freight vehicles (category N) with a permissible maximum weight over 3.5 t and to category N1 semi-trailer tractors (body code BC), loaded or empty, Belgian or foreign, in all three regions. The vehicle must drive with the OBU unit switched on. The unit must be activated and placed in the vehicle before entering Belgium; payment cannot be made retroactively.
The Dutch OBU unit NEDLINQ is not accredited in Belgium and must not be used there. The amount per kilometre depends on the region, vehicle weight, Euro standard and CO₂ emission class; new rates apply from 1 January 2027, which we do not list here.
Source: Viapass, distance-based toll (viapass.be) · checked 15 October 2026
Original wording
De kilometerheffing is van toepassing op: 1/ Alle voertuigen bestemd of gebruikt voor goederenvervoer (categorie N) met een Maximaal Toegelaten Massa (MTM) van meer dan 3,5 ton. 2/ Voertuigen van categorie N1 met carrosseriecode BC. Zij zijn onderworpen aan deze regelgeving: Ongeacht of de voertuigen leeg of geladen zijn. Source: Viapass, distance-based toll (Voor wie?) · checked 15 October 2026
The zone applies 24 hours every day and does not include the Ring. Diesel trucks from Euro 6 and petrol, CNG or LPG trucks from Euro 3 may enter without penalty; since 1 January 2026, diesel Euro 5 and petrol Euro 2 are no longer compliant. Vehicles registered abroad (except for a special case for the Netherlands) must register; requirements for trucks will be tightened further according to a specific calendar.
Vehicles that do not meet the conditions may drive with a one-day permit; certain vehicle types are eligible for an exemption. We do not list prices here.
Source: LEZ Brussels (lez.brussels) · checked 15 October 2026
Original wording
Actuellement, pour pouvoir circuler dans la LEZ sans recevoir d'amende, les véhicules Diesel (voitures, camionnettes, bus, poids-lourds) doivent être au minimum Euro 6. Les véhicules essence, CNG, et LPG (voitures, camionnettes, bus, motos, poids-lourds) doivent être au minimum Euro 3. Source: LEZ Brussels, lez.brussels (homepage) · checked 15 October 2026
up to 4 m
Maximum permitted vehicle height in the Kennedy, Beveren, Tijsman and Craeybeckx tunnels
According to the Flemish Traffic Centre, the maximum permitted vehicle height is 4 m in the Kennedytunnel (R1, 690 m), Beverentunnel (R2, 1,070 m), Frans Tijsmanstunnel (R2, 820 m) and Lode Craeybeckxtunnel (E19, 1,600 m). The Tijsmanstunnel and Craeybeckxtunnel have ADR category A.
The website does not state the height limit for Liefkenshoektunnel.
Source: Vlaams Verkeerscentrum, tunnels and closures (verkeerscentrum.be) · checked 17 October 2026
Original wording
De Kennedytunnel onder de Schelde is gelegen op de R1, het zuidelijke deel van de ring van Antwerpen. Hij is 690 meter lang. De maximaal toegelaten hoogte voor voertuigen in de Kennedytunnel bedraagt 4 meter. Het is een tunnel met ADR-tunnelcategorie D. Source: Vlaams Verkeerscentrum, tunnels and closures · checked 17 October 2026
up to 70 km/h
Weekdays 6:30–20:00, otherwise 100 km/h; applies to all vehicles
On weekdays from Monday to Friday between 6:30 and 20:00, the speed limit for all vehicles in the Kennedy Tunnel on the southern R1 ring road is 70 km/h; otherwise, it is 100 km/h. During regular maintenance, the tunnel is closed overnight in one direction only, from 21:00 until 5:00 at the latest. Since ADR transport must not use the tunnel, such traffic must take long detours, for example from R1 towards Ghent via A12-Zuid, N16 (Temsebrug) and E17.
The timing of night closures changes and is not listed here; the current status is shown by Vlaams Verkeerscentrum.
Source: Vlaams Verkeerscentrum, questions and answers and tunnels (verkeerscentrum.be) · checked 17 October 2026
Original wording
Op werkdagen, van maandag tot en met vrijdag, tussen 6u30 en 20u, geldt voor alle verkeer in de Kennedytunnel op de Antwerpse Ring R1 een maximumsnelheid van 70 km/u. Buiten die periode ligt de maximumsnelheid in de tunnel op 100 km/u. Source: Vlaams Verkeerscentrum, questions and answers (Kennedytunnel) · checked 17 October 2026
In the direction towards the Netherlands, in the Beveren Tunnel on R2, the number of lanes is temporarily reduced during peak traffic congestion to prevent queues inside the tunnel; regulation applies only in this direction. In March 2025, according to the Flemish Traffic Centre, stricter measures were introduced during tunnel reconstruction: during congestion, the tunnel is temporarily closed completely with red lights and traffic waits in front of it. During maintenance, the tunnel is closed overnight in one direction from 20:00 to 5:00; the detour route leads via the Kallo lock.
The questions and answers page is undated and does not state whether the stricter version introduced in March 2025 during reconstruction remains in force after its completion; the tunnel overview from the Flemish Traffic Centre confirms the standard peak-hour regulation.
Source: Vlaams Verkeerscentrum, questions and answers and tunnels (verkeerscentrum.be) · checked 17 October 2026
Original wording
Aan de Beverentunnel op de R2, de noordelijke helft van de Antwerpse Ring, in de richting van Nederland wordt op piekmomenten het principe van tunneldosering toegepast. Tunneldosering houdt in dat bij filevorming in/net na de tunnel het aantal beschikbare rijstroken tijdelijk beperkt wordt om de staart van de file uit de tunnel te halen. Source: Vlaams Verkeerscentrum, questions and answers (Beverentunnel) · checked 17 October 2026
minimum 50 m
Applies to vehicles and combinations over 7.5 t or longer than 7 m; monitored by cameras and road loops
At selected locations on Flemish motorways, cameras and road loops automatically monitor whether vehicles and combinations over 7.5 t or longer than 7 m keep a distance of at least 50 m, do not overtake in rain and do not use the hard shoulder without authorisation. Near Antwerp, such locations include, among others, E19 near Schoten towards Breda, E17 near Sint-Niklaas towards Kortrijk and E313 near Ranst towards Hasselt.
The list of locations is a selection from an AWV table for the Antwerp area; the page is undated and the list may change. From 1 June 2027, the current road code is to be replaced by a new regulation; the wording of the rules may change.
Source: Wegen en Verkeer (AWV), automatic monitoring of distances and overtaking (wegenenverkeer.be) · checked 17 October 2026
Original wording
Minimale onderlinge afstand van 50m tussen voertuigen of slepen met een maximale toegelaten massa van meer dan 7,5 ton of langer dan 7 meter Five locations for loading and transshipment of goods. One verified fact for each.
9 million TEU
terminal annual capacity (according to the operator)
According to the operator, Terminal MPET has a quay length of 3,700 m, an area of 247 ha and a capacity of 9 million TEU per year; trucks are accepted continuously from Monday 5:30 to Saturday 5:30.
Source: PSA Antwerp, MPET terminal page · checked 17 October 2026
266.5 million t
cargo handled in 2025
In 2025, 266.5 million t of cargo were handled in the Port of Antwerp-Bruges, 4.1 % less than in 2024.
Source: Port of Antwerp-Bruges, results for 2025 (27 January 2026) · checked 15 October 2026
3 million TEU
annual terminal capacity (according to PSA)
Noordzee Terminal has, according to PSA, a quay length of 1,265 m, an area of 92 ha and a capacity of 3 million TEU per year; trucks are accepted continuously from Monday 5:30 to Saturday 5:30.
Source: PSA Antwerp, Noordzee Terminal page · checked 17 October 2026
2,800,000 TEU
terminal capacity (according to operator)
The DP World Antwerp Gateway terminal has, according to the operator, a quay length of 1,660 m, 15 container gantry cranes and a capacity of 2,800,000 TEU.
Source: DP World, Antwerp terminal page · checked 17 October 2026
According to the infrastructure manager Infrabel, Antwerpen-Noord is a marshalling yard where freight trains are split and reassembled according to destination; the Liefkenshoek connection, leading directly to it and running mostly underground from Waaslandhaven on the left bank, is key for container transport in the port.
Source: Infrabel, The Port of Antwerp page · checked 17 October 2026
Europe → Antwerp
From anywhere in Europe.
Antwerp → Europe
To anywhere in Europe.
Full truckload shipments across Europe. Direct delivery without transshipment on an agreed schedule.
Learn moreGroupage transport for partial shipments. An economical solution for smaller volumes.
Learn moreUrgent shipments delivered within 24 hours. Dispatch Mon-Fri 08:00-17:00 and priority handling.
Learn moreTransport of dangerous goods in compliance with ADR regulations. Specialized vehicles and complete documentation.
Learn moreTransport of steel coils using specialized Coil Mulde trailers. Safe securing and handling of heavy cargo.
Learn moreDidn't find your answer? info@everestsolutions.cz
Yes. We deliver to and from Antwerp, from anywhere to anywhere across Europe, in full trailers or by the pallet. We send the quote the same working day.
We send the quote the same working day and agree the loading date with you. For urgent shipments we offer express delivery within 24 hours.
Yes, we transport dangerous goods under ADR rules. State the UN number and class in your inquiry and we will check that we can carry it.
Every price is an individual quote and depends on the type of transport (FTL/LTL), weight, volume and route. We send the quote the same working day.
Rules and loading locations were verified from 15 October 2026 to 17 October 2026, distances on 15 October 2026.
Viapass, distance-based toll (viapass.be)
official
LEZ Brussels (lez.brussels)
official
Vlaams Verkeerscentrum, tunnels and closures (verkeerscentrum.be)
official
Vlaams Verkeerscentrum, questions and answers and tunnels (verkeerscentrum.be)
official
Wegen en Verkeer (AWV), automatic monitoring of distances and overtaking (wegenenverkeer.be)
official
PSA Antwerp, MPET terminal page
operator
Port of Antwerp-Bruges, results for 2025 (27 January 2026)
operator
PSA Antwerp, Noordzee Terminal page
operator
DP World, Antwerp terminal page
operator
Infrabel, The Port of Antwerp page
operator
OpenStreetMap (OSRM), Regulation (EC) No 561/2006 and AETR agreement
calculation and regulation
Everest's own website and terms and conditions
own data