FTL Transport
Full truckload shipments across Europe. Direct delivery without transshipment on an agreed schedule.
Learn more
Liberec Czech Republic
We deliver to and from Liberec: from anywhere to anywhere across Europe, in full trailers or by the pallet. Liberec, once a city of cloth-making and the textile industry, is today the center of the Liberec Region in northern Bohemia. We transport goods for the automotive industry and confectionery.
Reply the same working day
Step 1 of 3
From anywhere: type a city or postcode
Anywhere: start typing and we'll suggest cities
Pick a day in the calendar or leave As soon as possible
We send you an individual price, the same working day.
One driver gets there from Prague, Vienna, Munich and Warsaw in one day, from Rotterdam and Milan in two days. All six cities are within 1,250 km.
From
Road distance
Pure driving time
One driver's trip
1,250 km
Prague
108 km
about 1.4 h
1 day
Vienna
438 km
about 5.8 h
1 day
Munich
495 km
about 6.6 h
1 day
Warsaw
571 km
about 7.6 h
1 day
Rotterdam
914 km
about 12.2 h
2 days
Milan
983 km
about 13.1 h
2 days
Road distance: OpenStreetMap, OSRM routing (car profile), approximate. Pure driving time: a truck at an average of 75 km/h (our assumption). One driver's trip: at most 9 hours of driving a day, twice a week 10 hours (Regulation (EC) No 561/2006, Art. 6, and the AETR agreement, Art. 6). With two drivers the trip is shorter. We always confirm the loading and delivery date in the quote.
Source: OpenStreetMap (OSRM), Regulation (EC) No 561/2006, AETR · verified 15 Oct 2026
What applies to trucks in Czechia and around the city. Every rule shows its source and the date it was verified.
over 7.5 t
Over 3.5 t with a trailer
On Sundays and public holidays
A ban applies on motorways and class I roads on Sundays and other days of rest from 13:00 to 22:00, and in July and August also on Saturdays from 7:00 to 13:00 and on Fridays from 17:00 to 21:00. It covers goods and special vehicles with a maximum permissible weight over 7.5 t, and over 3.5 t with a trailer. Exemptions include combined transport to or from the nearest transshipment point, perishable goods (at least half of the cargo space) and live animals.
An exemption for reasons deserving special consideration is granted by the regional office, beyond the region by the Ministry of Transport.
Source: Section 43 of Act No. 361/2000 Coll., gov.cz portal · verified 15 Oct 2026
Original wording
Vozidla nad 7 500 kg a automobily s přípojným vozíkem nad 3 500 kg nesmí cestovat po dálnici nebo silnici I. třídy: v neděli a ostatních dnech pracovního klidu v době od 13.00 do 22.00 hodin, v sobotu v období od 1. července do 31. srpna v době od 7.00 do 13.00 hodin, v pátek v období od 1. července do 31. srpna v době od 17.00 do 21.00 hodin. over 3.5 t
On motorways and selected class I road sections
Toll applies to a road motor vehicle with at least four wheels and a maximum permissible weight over 3.5 t on motorways and selected class I road sections. The toll is calculated from the distance driven and depends on the vehicle category, number of axles, weight, road category and emission class. Before driving, the vehicle must be registered in the electronic toll system and fitted with a non-transferable on-board unit (OBU).
The data on toll roads and the on-board unit come from a Ministry of Transport page dated 12 May 2025.
Source: Section 22 of Act No. 13/1997 Coll.; Czech Customs Administration; Ministry of Transport · verified 15 Oct 2026
Original wording
Užití zpoplatněné pozemní komunikace silničním motorovým vozidlem nejméně se čtyřmi koly, jehož největší povolená hmotnost činí více než 3,5 tuny, nebo traktorem o největší povolené hmotnosti vyšší než 3,5 tuny a konstrukční rychlosti 80 km.h-1 nebo vyšší (dále jen „vozidlo v systému elektronického mýtného“) podléhá úhradě mýtného. Source: Section 22(1) of Act No. 13/1997 Coll., zakonyprolidi.cz · verified 15 Oct 2026
over 3.5 t
Toll sections near this city
According to the Ministry of Transport annex (status as of 1 Jan 2025), toll applies on the D10 motorway (Praha-Satalice – Ohrazenice, exits 1–71) and on the connecting section of road I/35 between Ohrazenice and Bílý Kostel nad Nisou, on which Liberec lies.
The list is as of 1 Jan 2025; the valid network is set by Decree No. 470/2012 Coll. and the map at myto.gov.cz. Toll applies to vehicles over 3.5 t.
Source: Ministry of Transport, Annex 2 of the EETS contract, Network of toll roads (as of 1 Jan 2025) · verified 2 Nov 2026
Original wording
D10 Praha-Satalice - Ohrazenice (exity 1-71) 72,7; I/35 Bílý Kostel nad Nisou - Ohrazenice 33,8 One place for loading and transshipment of goods. One verified fact for each.
13,000
cars a day on the single access street (figure from 2017)
According to a report by the Confederation of Industry and Transport of 2 Jun 2017, the zone covered 125 ha and about twenty companies operated in it, mainly suppliers of car parts. Only the street České Mládeže connected it to the main route to Prague, used by 13,000 cars a day; at shift changes, according to the regional governor, queues stood almost back to the expressway. We found no more recent figure on access.
Source: Confederation of Industry and Transport of the Czech Republic, press release Meeting on traffic in the Liberec Jih industrial zone, 2 Jun 2017 · verified 2 Nov 2026
Europe → Liberec
From anywhere in Europe.
Liberec → Europe
To anywhere in Europe.
Automotive parts, goods for the automotive industry
Usti nad Labem Region
Engineering goods, musical instruments
Bohemia
Full truckload shipments across Europe. Direct delivery without transshipment on an agreed schedule.
Learn moreGroupage transport for partial shipments. An economical solution for smaller volumes.
Learn moreUrgent shipments delivered within 24 hours. Dispatch Mon-Fri 08:00-17:00 and priority handling.
Learn moreLiberec lies on the Lusatian Neisse about 80 km north-east of Prague, most of its territory is in the Zittau Basin, and the European route E442 passes through it. It was historically a textile centre, nicknamed the “Manchester” of Bohemia; today the automotive companies Denso Manufacturing, Magna Exteriors and Webasto are among its largest employers. The Liberec–Jablonec agglomeration has about 227,000 inhabitants. From Prague it is about 107 km by road: at our planning average of 75 km/h that is roughly 1.4 hours of pure driving, far inside one driver's nine-hour daily limit. Sources: OpenStreetMap (OSRM, approximate), Regulation (EC) No 561/2006, Wikipedia · checked 22.11.2026.
Didn't find your answer? info@everestsolutions.cz
Yes. We deliver to and from Liberec, from anywhere to anywhere across Europe, in full trailers or by the pallet. We send the quote the same working day.
We send the quote the same working day and agree the loading date with you. For urgent shipments we offer express delivery within 24 hours.
Every price is an individual quote and depends on the type of transport (FTL/LTL), weight, volume and route. We send the quote the same working day.
It is 108 km by road from Prague, about 1.4 h of pure truck driving. The figure is approximate (OpenStreetMap, OSRM routing, verified 15 Oct 2026); we always confirm the loading and delivery date in the quote.